HydroBASINS lev08 watershed · #4080991730
Bassin de Mahi
A watershed (drainage basin) is not a body of water — it is the land area where rainfall converges towards a single river that eventually reaches the sea (or an endorheic basin). Boundaries follow ridgelines.
Crosses 3 administrative regions : Anand, Kheda, Vadodara
Sub-basin area
25,5km²
Upstream area
32 508,9km²
Discharge
376,46m³/s
Mean elev.
52m
Administrative coverage
Hydrographic chain
▼ Drains into
▲ Receives from 2 basins
- Bassin de Goma875 km²
- Bassin de Mahi212 km²
3 dept-equivalent regions (GADM L2)
- 22.7 km²89.3% of basin
- 1.7 km²6.7% of basin
- 1.0 km²4.0% of basin
Computed live · GADM 4.1 × HydroBASINS lev08 × WDPA · cached after first hit.
Species present
0 distinct species · 0 observations
Source: GBIF Occurrence snapshot 2026-05-01.
Ecological tissue
Graphe en cours d’indexation
Calcul du tissu écologique de cette entité.
Le graphe apparaîtra automatiquement dès que le calcul est terminé (rafraîchissement toutes les 2s).
Hydroclimate (BasinATLAS lev08)
Mean T°
27,2°C
Annual rain
813mm
Moisture idx (CMI)
-0,56
Runoff
348mm/an
PET
1 847mm
AET
687mm
Mean slope
0,7°
Water table
128cm
Forest
49%
Crops
87%
Urban
14%
Protected
0%
HydroATLAS BasinATLAS v10 (Linke et al. 2019) · HydroBASINS lev08 (Lehner & Grill 2013)