Ontologia

Commune · FRA

Saint-Barthélemy

France

CfbTemperate, no dry season, warm summer(75 %)

Area

7,7km²

Ecological tissue

Graphe en cours d’indexation

Calcul du tissu écologique de cette entité.

Le graphe apparaîtra automatiquement dès que le calcul est terminé (rafraîchissement toutes les 2s).

Species present

Computing species observations from GBIF…

Densité d'observations

0 obs · 0 cellules

Source : GBIF — observations agrégées par hexagones 0.2° × 0.2° (~22km), filtre précision coordonnée < 10 km. Fond carte : OpenFreeMap · © OpenStreetMap.

Climate

Mean T°

12,0°C

Annual rain

997mm

Warmest m°

26,0°C

Coldest m°

-0,9°C

Elevation: 290 m on average (min 276 m, max 328 m)

Bioclimatic detailsExpert
Annual mean temp.
12,0°C
Annual rain
997mm
Warmest month
26,0°C
Coldest month
-0,9°C
Mean alt.
290m
Min
276m
Max
328m
Std. dev.
17m
Köppen-Geiger (dominant)
CfbTemperate, no dry season, warm summer(75 %)Temperate

CHELSA BIO 1-19 v2.1 · ETOPO DEM 60s · Köppen-Geiger 1991-2020 (Beck et al. 2018)

Soil & lithology

pH H₂O

6,5

Org. C

29,0g/kg

Clay

23,3%

Sand

31,5%

Silt

45,2%

Average over 0-30 cm. Per-depth details in expert panel.

Dominant lithology: scGLiMaggregated to Isère

3 soil depths detailedExpert
0–5 cm
pH H₂O
6,4
Org. C
49,3g/kg
Clay
21,2%
Sand
32,2%
Silt
46,6%
5–15 cm
pH H₂O
6,5
Org. C
19,8g/kg
Clay
21,7%
Sand
30,8%
Silt
47,4%
15–30 cm
pH H₂O
6,5
Org. C
17,9g/kg
Clay
27,0%
Sand
31,4%
Silt
41,6%

SoilGrids 250m (ISRIC, 2017) · GLiM v1.0 (Hartmann & Moosdorf 2012)

Land cover

Forest6.4%
Crops67.1%
Built-up1.6%
Bare soil1.8%
Other (grassland, water…)23.1%

Copernicus Global Land Cover 100m (Buchhorn et al. 2020)

Hydrology

Computing basins, lakes, rivers…

Human pressure

Pop. density

1hab/km²

Night light

1,3nW

Built-up

159,3%

Pesticides

45,3kg/km²

GHSL POP/Built 2020 · VIIRS lumière nocturne · PEST-CHEMGRIDS 2020 (Maggi et al.)

France-specific data (Phase 2)

ZNIEFF, Natura 2000, INPN protected spaces, BNV-D pesticides, Naïades water quality, SAFRAN fine climate, BRGM lithology — Layer FR to load in Phase 2.