Ontologia

Commune · FRA

Labastide-Gabausse

France

CfbTemperate, no dry season, warm summer(57 %)

Area

12,7km²

Ecological tissue

Graphe en cours d’indexation

Calcul du tissu écologique de cette entité.

Le graphe apparaîtra automatiquement dès que le calcul est terminé (rafraîchissement toutes les 2s).

Species present

Computing species observations from GBIF…

Densité d'observations

0 obs · 0 cellules

Source : GBIF — observations agrégées par hexagones 0.2° × 0.2° (~22km), filtre précision coordonnée < 10 km. Fond carte : OpenFreeMap · © OpenStreetMap.

Climate

Mean T°

12,6°C

Annual rain

915mm

Warmest m°

26,0°C

Coldest m°

1,5°C

Elevation: 299 m on average (min 265 m, max 325 m)

Bioclimatic detailsExpert
Annual mean temp.
12,6°C
Annual rain
915mm
Warmest month
26,0°C
Coldest month
1,5°C
Mean alt.
299m
Min
265m
Max
325m
Std. dev.
19m
Köppen-Geiger (dominant)
CfbTemperate, no dry season, warm summer(57 %)Temperate

CHELSA BIO 1-19 v2.1 · ETOPO DEM 60s · Köppen-Geiger 1991-2020 (Beck et al. 2018)

Soil & lithology

pH H₂O

6,8

Org. C

27,5g/kg

Clay

26,8%

Sand

35,0%

Silt

38,2%

Average over 0-30 cm. Per-depth details in expert panel.

Dominant lithology: ssGLiMaggregated to Tarn

3 soil depths detailedExpert
0–5 cm
pH H₂O
6,7
Org. C
43,5g/kg
Clay
25,3%
Sand
36,0%
Silt
38,6%
5–15 cm
pH H₂O
6,8
Org. C
22,2g/kg
Clay
25,0%
Sand
36,2%
Silt
38,8%
15–30 cm
pH H₂O
6,8
Org. C
16,8g/kg
Clay
30,0%
Sand
32,7%
Silt
37,3%

SoilGrids 250m (ISRIC, 2017) · GLiM v1.0 (Hartmann & Moosdorf 2012)

Land cover

Forest10.1%
Crops57.9%
Built-up0.8%
Bare soil2.7%
Other (grassland, water…)28.7%

Copernicus Global Land Cover 100m (Buchhorn et al. 2020)

Hydrology

Computing basins, lakes, rivers…

Human pressure

Pop. density

0hab/km²

Night light

0,0nW

Built-up

76,1%

Pesticides

45,8kg/km²

GHSL POP/Built 2020 · VIIRS lumière nocturne · PEST-CHEMGRIDS 2020 (Maggi et al.)

France-specific data (Phase 2)

ZNIEFF, Natura 2000, INPN protected spaces, BNV-D pesticides, Naïades water quality, SAFRAN fine climate, BRGM lithology — Layer FR to load in Phase 2.