HydroBASINS lev08 watershed · #5080170970
Bassin de Batang Hari Leko
A watershed (drainage basin) is not a body of water — it is the land area where rainfall converges towards a single river that eventually reaches the sea (or an endorheic basin). Boundaries follow ridgelines.
Crosses 3 administrative regions : Musi Banyuasin, Musi Rawas, Sarolangun
Sub-basin area
928,8km²
Upstream area
928,8km²
Discharge
54,34m³/s
Mean elev.
71m
Administrative coverage
Hydrographic chain
▼ Drains into
▲ Receives from 0 basins
Source / headwater (no upstream basin)
3 dept-equivalent regions (GADM L2)
- 722.6 km²78.1% of basin
- SarolangunJambi · Indonesia182.6 km²19.7% of basin
- 19.6 km²2.1% of basin
Computed live · GADM 4.1 × HydroBASINS lev08 × WDPA · cached after first hit.
Species present
14 distinct species · 14 observations
Source: GBIF Occurrence snapshot 2026-05-01.
Ecological tissue
Not enough documented interactions to build a meaningful graph for this territory.
Hydroclimate (BasinATLAS lev08)
Mean T°
26,7°C
Annual rain
2 574mm
Moisture idx (CMI)
0,36
Runoff
1 804mm/an
PET
1 656mm
AET
1 611mm
Mean slope
1,3°
Water table
38cm
Forest
29%
Crops
42%
Urban
0%
Protected
0%
HydroATLAS BasinATLAS v10 (Linke et al. 2019) · HydroBASINS lev08 (Lehner & Grill 2013)