HydroBASINS lev08 watershed · #4080862710
Bassin de 武水河
A watershed (drainage basin) is not a body of water — it is the land area where rainfall converges towards a single river that eventually reaches the sea (or an endorheic basin). Boundaries follow ridgelines.
Crosses 2 administrative regions : Hengyang, Shaoyang
Sub-basin area
328,4km²
Upstream area
328,4km²
Discharge
7,99m³/s
Mean elev.
219m
Administrative coverage
Hydrographic chain
▼ Drains into
▲ Receives from 0 basins
Source / headwater (no upstream basin)
2 dept-equivalent regions (GADM L2)
- 323.4 km²98.6% of basin
- 4.4 km²1.4% of basin
Computed live · GADM 4.1 × HydroBASINS lev08 × WDPA · cached after first hit.
Species present
3 distinct species · 3 observations
Source: GBIF Occurrence snapshot 2026-05-01.
Ecological tissue
Not enough documented interactions to build a meaningful graph for this territory.
Hydroclimate (BasinATLAS lev08)
Mean T°
17,6°C
Annual rain
1 453mm
Moisture idx (CMI)
0,22
Runoff
768mm/an
PET
1 139mm
AET
1 025mm
Mean slope
6,9°
Water table
234cm
Forest
47%
Crops
26%
Urban
14%
Protected
0%
HydroATLAS BasinATLAS v10 (Linke et al. 2019) · HydroBASINS lev08 (Lehner & Grill 2013)