HydroBASINS lev08 watershed · #4080285760
Bassin · #4080285760
A watershed (drainage basin) is not a body of water — it is the land area where rainfall converges towards a single river that eventually reaches the sea (or an endorheic basin). Boundaries follow ridgelines.
Crosses 1 administrative regions : Changji Hui
Sub-basin area
172,6km²
Upstream area
4 101,9km²
Discharge
2,42m³/s
Mean elev.
686m
Administrative coverage
Hydrographic chain
▼ Drains into
▲ Receives from 2 basins
- Bassin · #40802906402224 km²
- Bassin · #40802907401705 km²
1 dept-equivalent regions (GADM L2)
- 173.0 km²100.0% of basin
Computed live · GADM 4.1 × HydroBASINS lev08 × WDPA · cached after first hit.
Species present
0 distinct species · 0 observations
Source: GBIF Occurrence snapshot 2026-05-01.
Ecological tissue
Not enough documented interactions to build a meaningful graph for this territory.
Hydroclimate (BasinATLAS lev08)
Mean T°
6,9°C
Annual rain
103mm
Moisture idx (CMI)
-0,90
Runoff
5mm/an
PET
1 036mm
AET
98mm
Mean slope
1,9°
Water table
187cm
Forest
0%
Crops
0%
Urban
0%
Protected
43%
HydroATLAS BasinATLAS v10 (Linke et al. 2019) · HydroBASINS lev08 (Lehner & Grill 2013)